Edit Content

Project Overview

Salient Features of Project
Name of Project:Construction of 4 Lane Bypass to NH114A Connecting NH333 and NH133(Deoghar Bypass) frm design km 0.000 to design Km 49.000(Total Length 49.000 km)in the state of Jharkhand on HAM
Mode:Hybrid Annuity Mode
Client:National Highway Authority of India
Concessionaire :M/s Deoghar Ring Road Project Private Limited
Awarded Contract Value :972.135 Cr (Excluding GST)
Date of Agreement :05.June.2025
Appointed Date:yet to Receive
Technical Details :
Length:Km49 Km
Green Field:Km49 Km
Lane:-4 Lane
Service Road:Km4.184
Slip Roads:Km20.5
Type of Pavement:-Flexible pavement - (Except Toll Plaza Location)
MSA:-MCW-70 MSA
MSA:-SR-20 MSA
ROB:Nos02
22+048:m2x31.28 + 1x52.08 + 2x31.28 = 177.2
30+317:m3x31.28 + 1x52.08 + 1x30 = 175.92
RUB:Nos01
Major Bridges:Nos05
Minor Bridges:Nos20
VUP:Nos10
LVUP:Nos07
SVUP:Nos15
Culverts:Nos88 Nos
Box Type:Nos28
Hume Pipe:Nos60
Toll Plaza:Nos2
At Grade Minor Junctions :Nos7
RCC Cover Drain:Km24.552
Highway Nest (mini):Nos2
Rest Area:Nos01
Truck Lay Bye:Nos01
Bus Shelters:Nos20